First name, Middle name, Last name, Scientific degree, Scientific rank, Current position. Full and brief name of the organization, The organization address. | Ibragimov R.A. – candidate of technical sciences, associate professor E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Antakov A.B. – candidate of technical sciences, associate professor E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Minakhmetova L.R. – student E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Kazan State University of Architecture and Engineering The organization address: 420043, Russia, Kazan, Zelenaya st., 1 |
Title of the article | The determination and comparison of time limits for installation works using metal and composite rebar |
Abstract. | Рroblem Statement. The task was to identify the time norms for the installation of composite reinforcement in the manufacture of building structures such as foundations and brickwork, using the existing time standards for the installation of metal fittings, as well as using two methods of calculating time norms: the calculation and research and calculation- Analytical. Results. The paper presents analysis, comparison of time norms of composite reinforcement and metal using ENiR Collection E4. Installation of prefabricated and monolithic reinforced concrete structures. Issue 1. Experiments were carried out on the construction of brickwork with reinforcement by metal armature, composite reinforcement and geosynthetics, fixing the timing of all types of work, and time limits were set for the installation of composite reinforcement, depending on its diameter. Conclusions. The obtained data will allow to use them in calculating time limits, the duration of construction works with the use of composite materials that will give the end result more close to the actual standard time in the construction works. |
Keywords. | composite reinforcement, duration, calculation of standard time. |
For citations: | Ibragimov R.A., Antakov A.B., Minakhmetova L.R. The determination and comparison of time limits for installation works using metal and composite rebar // Izvestiya KGASU. 2017. №2(40) P.257-264. |