First name, Middle name, Last name, Scientific degree, Scientific rank, Current position. Full and brief name of the organization, The organization address. | Kokliugina L.A. – candidate of technical sciences, associate professor E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Kokliugin А.V. – associate professor Shilova E.А. – student Kazan State University of Architecture and Engineering The organization address: 420043, Russia, Kazan, Zelenaya st., 1 |
Title of the article | The problems of planning and works оrganization for capital repair and reconstruction |
Abstract. | The article deals with the currently existing problem of ensuring technological reliability of works on capital repair and reconstruction of buildings and structures of mass housing development, provided with large-panel apartment houses of typical series. The article presents the data of housing in Kazan for the time of construction and maintenance. By analyzing them, we can conclude that the capital repair and reconstruction of housing in Kazan will last a long time. In spite of the existing differences between clients, contractors and operators, the work must be performed both at the expense of budgets of different levels, and at the expense of private investors who finance only commercially profitable projects. The time of work is influenced by many factors, both objective and subjective, and often even the weather. The current system of tenders for works on repairing and reconstruction did not take into account climatic conditions. Therefore, the development of project documentation and acceptance of constructive and technological solutions needs to be considered to perform works in adverse weather conditions. All additional work and costs, raise the price of construction and, accordingly, reduce the profits of the contractor, if possible, should be taken into account in advance at the design stage. Thus, the development of organizational and technological documentation is encouraged to develop standard routings for each type series, subject to repair houses with the possibility of binding maps to the actual timing of the start of works and preliminary agreement with the relevant operational services. |
Keywords. | capital repairs, reconstruction, standard routings. |
For citations: | Kokliugina L.A., Kokliugin А.V., Shilova E.А. The problems of planning and works оrganization for capital repair and reconstruction // Izvestiya KGASU. 2016. №4(38) P.428-432. |