First name, Middle name, Last name, Scientific degree, Scientific rank, Current position. Full and brief name of the organization, The organization address. | Petropavlovskih Olga Konstantinovna senior lecturer E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Loginova Olga Anatolyevna candidate of technical sciences, associate professor E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Kazan State University of Architecture and Engineering The organization address: 420043, Russia, Kazan, Zelenaya st., 1 Apakova Diana Radikovna engineer estimator E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it LLC «Тehno-R» The organization address: 420054, Russia, Kazan, Tehnicheskaya st., 52 Aliullina Gulnaz Ildusovna 3rd category engineer E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it LLC «IK «Spektr» The organization address: 420061, Russia, Kazan, Kosmonavtov st., 44 Ibrsgimova Aniia Airatovna engineer E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it LLC « Avtodorogi i sooruzheniya » The organization address: 420087, Russia, Kazan, Karbyshev st., 15 |
Title of the article | Project management in the construction of artificial structures |
Abstract. | Problem statement. The purpose of the study is to determine the specifics of managing the construction of artificial structures using modern software products. The following tasks are defined: 1) to consider the Spider Project, the main advantages and disadvantages and principles of the software package; 2) to consider Primavera, the main advantages and disadvantages and principles of the software package; 3) to consider the Microsoft Project, the main advantages and disadvantages and principles of the software; 4) Study the examples of work in the software package Spider Project. Results. Main results of the research: three software packages for project management and calendar planning were considered. Presents their main positive and negative options. Identified optimal areas of application software systems. Conclusions. The significance of the results for transport construction is that with the use of modern project management methods, it is possible to establish optimal construction time of artificial structures, effectively develop a project for the installation of bridge structures, select high-tech sets of machines and mechanisms, and also competently coordinate the management process construction as a whole in accordance with the planned indicators. |
Keywords. | project management, bridge, bridges, software, schedule, planning, Spider Project, Primavera, Microsoft Project. |
For citations: | Petropavlovskih O.K., Loginova O.A., Apakova D.R., Aliullina G.I., Ibrsgimova A.A. Project management in the construction of artificial structures // Izvestiya KGASU. 2019. №2(48) P.290-297. |