Archive - Известия Казанского государственного архитектурно-строительного университета.

Включен в Перечень ведущих рецензируемых научных журналов и изданий, определяемый ВАК

Archive

About the authors



First name, Middle name, Last name, Scientific degree, Scientific rank, Current position. Full and brief name of the organization, The organization address.Ibragimov R.A. – candidate of technical sciences, associate professor E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it ; Salimova G.R. – student E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Kazan State University of Architecture and Engineering The organization address: 420043, Russia, Kazan, Zelenaya st., 1
Title of the articleAnalysis of the duration of the construction of modern large-panel residential buildings in Kazan
Abstract.The article presents data comparing the actual and normative duration of the construction of large residential buildings in Kazan. Statistical array of background information for large-type series of buildings collected. The analysis showed that the implementation of investment projects, the rich variety of new space-planning and design solutions, methods of organizing production and construction technology of construction and assembly works, we need to significantly improve the valuation methodology duration of the construction of buildings and structures. On the basis of the analysis showed that the values of deviations of actual indicators of the duration of the construction of the standard leads to the conclusion that the period of construction of housing 14 and 17 storey buildings much higher than the normative terms of construction. Comparative analysis of existing good practice and the duration of the construction of buildings and structures shows that the total duration of the construction of residential buildings is the sum of the durations of the preparatory period, the device underground and aboveground parts finishing. This method of determining the duration of the construction is suitable for the organization of building a consistent method, but in a modern building in the main line method is applied, this approach is contrary to the definition of the duration of the construction of the production organization of construction, it does not reflect the appropriate solutions in the organizational and technological documentation. On the basis of a large number of statistical data it is necessary to develop recommendations for the definition of standards for the duration of the construction of large-type series of buildings in Kazan.
Keywords.duration of construction, large-panel residential buildings, the standard period.
For citations:Ibragimov R.A., Salimova G.R. Analysis of the duration of the construction of modern large-panel residential buildings in Kazan // Izvestiya KGASU. 2016. №2(36) P.228-232.


New issues

 
Russian (CIS)English (United Kingdom)

Search

Vinaora Visitors Counter

mod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_counter
mod_vvisit_counterToday76
mod_vvisit_counterYesterday61
mod_vvisit_counterThis week250
mod_vvisit_counterLast week653
mod_vvisit_counterThis month250
mod_vvisit_counterLast month2858
mod_vvisit_counterAll days792960

Online (12 hours ago): 2
Your IP: 192.168.1.44
MOZILLA 5.0,
Today: Дек 04, 2024