First name, Middle name, Last name, Scientific degree, Scientific rank, Current position. Full and brief name of the organization, The organization address. | Harisov A.R. – student Kokliugina L.A. – candidate of technical sciences, associate professor E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Kokliugin А.V. – associate professor Kazan State University of Architecture and Engineering The organization address: 420043, Russia, Kazan, Zelenaya st., 1 |
Title of the article | The research of existing duration determining methods in the industrial projects |
Abstract. | Duration of construction building is one of the basic indicators at all stages of economic, design, planned and organizational preparation and building realization/ Article examines the discrepancy between actual terms of construction and normative data. By the example of petroleum-refining buildings this article identifies the reasons for backlog from directive terms. Principal cause of change of building terms is the wrong choice of administrative decisions. For more exact result it is necessary to spend alternative study with use of various duration definition methods. Design comparison and actual building duration suggests standard building terms definition by a traditional method yields exact results at «General Contractor» way. At building performance by other ways using a settlement method of duration authentic results definition are possible in two variants: 1) the Establishment of a rough termination date of building with instructions of a firm project cost in the turnkey contract 2) An establishment of a firm termination date of object building. with an establishment of an estimated cost of object and payment of the executed works on actual expenses. It is obvious that considerable transformations to a control system of the building manufacture, providing effective interaction of all links of a building complex are necessary, since preparation of manufacture and finishing delivery of objects in operation. |
Keywords. | Calendar planning, duration of construction, administrative decision, cash flow. |
For citations: | Harisov A.R., Kokliugina L.A., Kokliugin А.V. The research of existing duration determining methods in the industrial projects // Izvestiya KGASU. 2012. №1(19) P.134-139. |