Archive - Известия Казанского государственного архитектурно-строительного университета.

Включен в Перечень ведущих рецензируемых научных журналов и изданий, определяемый ВАК

Archive

About the authors



First name, Middle name, Last name, Scientific degree, Scientific rank, Current position. Full and brief name of the organization, The organization address.Busarev Andrey Valerevich candidate of technical sciences, assistant professor E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Sheshegova Irina Gennadievna senior lecturer E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Kazan State University of Architecture and Engineering The organization address: 420043, Russia, Kazan, Zelenaya st., 1 Tazmieva Ilnara Nailevna E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it OOO «Mayak-NK» The organization address: 420029, Russia, Kazan, Sibirskii tract, 39
Title of the articleResearch of the process of preparation of technical water for flooding oil-bearing horizons using pressure hydrocyclones
Abstract.Problem statement. To increase the oil recovery of productive horizons, a method of maintaining reservoir pressure is used. The essence of this method is the injection of water from surface sources into the oil-bearing horizons through injection wells. In order to prevent clogging of the porous channels of the oil-bearing horizons, it is necessary to purify the water pumped into the injection wells from suspended solids. This article is devoted to water purification for flooding of oil-bearing horizons from suspended matter using «hydrocyclone-sedimentation unit» units. The purpose of these studies is to determine the settling time necessary for the purification of water treated in the pressure cylindrical hydrocyclones of the Kazan State University of Architecture and Engineering (KSUAЕ). Results. The main results of these studies consist in determining the settling time of the water necessary for cleaning water from suspended matter, treated in pressure hydrocyclones. Conclusions. The significance of the results obtained for the construction industry is to determine the settling time necessary for the purification from suspended solids of water, which has been treated in pressure hydrocyclones, which makes it possible to perform technological calculations for units such as «hydrocyclone-sedimentation unit».
Keywords.technical water for waterflooding of oil-bearing horizons, purification of water from surface sources from suspended solids, «hydrocyclone-settler» type unit, determination of sedimentation time for purification from suspended water processed in pressure hydrocyclones.
For citations:Busarev A.V., Sheshegova I.G., Tazmieva I.N. Research of the process of preparation of technical water for flooding oil-bearing horizons using pressure hydrocyclones // Izvestiya KGASU. 2018. №3(45) P.162-170.


New issues

 
Russian (CIS)English (United Kingdom)

Search

Vinaora Visitors Counter

mod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_counter
mod_vvisit_counterToday107
mod_vvisit_counterYesterday93
mod_vvisit_counterThis week617
mod_vvisit_counterLast week633
mod_vvisit_counterThis month2140
mod_vvisit_counterLast month777
mod_vvisit_counterAll days773483

Online (12 hours ago): 2
Your IP: 192.168.1.44
MOZILLA 5.0,
Today: Апр 25, 2024